Location
& QuickFacts
|
FAA Information Effective: |
2007-07-05 |
|
Airport
Identifier: |
7GA1 |
|
Airport
Status: |
Operational |
|
Longitude/Latitude: |
084-23-08.0000W/33-47-57.3780N
-84.385556/33.799272 (Estimated) |
|
Elevation: |
903 ft / 275.23 m (Estimated) |
|
Land: |
0
acres |
|
From
nearest city: |
3 nautical miles N of Atlanta, GA |
|
Location: |
Fulton County, GA |
|
Magnetic Variation: |
02W (1985) |
Owner
& Manager
|
Ownership: |
Privately owned |
|
Owner: |
Wsb-tv |
|
Address: |
1601 W Peachtree St N.e.
Atlanta, GA 30309 |
|
Phone
number: |
404-897-7000 |
|
Manager: |
Greg Stone |
|
Address: |
1601 W Peachtree St N.e.
Atlanta, GA 30309 |
|
Phone number: |
404-897-7000 |
Airport
Operations and Facilities
|
Airport Use: |
Private |
|
Wind
indicator: |
Yes |
|
Segmented
Circle: |
No |
|
Control
Tower: |
No |
|
Landing
fee charge: |
No |
|
Sectional
chart: |
Atlanta |
|
Region: |
ASO - Southern |
|
Boundary
ARTCC: |
ZTL - Atlanta |
|
Tie-in
FSS: |
MCN - Macon |
|
FSS
on Airport: |
No |
|
FSS
Toll Free: |
1-800-WX-BRIEF |
|
Runway Information
Helipad H1
|
Dimension: |
21
x 21 ft / 6.4 x 6.4 m |
|
Surface: |
WOOD, |
|
|
Runway H1 |
Runway |
|
Traffic
Pattern: |
Left |
Left |
|
Radio Navigation
Aids
|
ID |
Type |
Name |
Ch |
Freq |
Var |
Dist |
|
BR |
NDB |
Redan |
|
266.00 |
02W |
10.0 nm |
|
FT |
NDB |
Flanc |
|
344.00 |
02W |
12.8 nm |
|
DJD |
NDB |
Canton |
|
415.00 |
04W |
27.7 nm |
|
FF |
NDB |
Pecat |
|
316.00 |
02W |
30.4 nm |
|
VOF |
NDB |
Alcovy |
|
370.00 |
03W |
31.8 nm |
|
JNM |
NDB |
Monroe |
|
392.00 |
03W |
33.1 nm |
|
EVZ |
NDB |
Cartersville |
|
308.00 |
04W |
33.1 nm |
|
FKV |
NDB |
Flowery Branch |
|
365.00 |
03W |
34.1 nm |
|
EQQ |
NDB |
Coweta County |
|
234.00 |
03W |
36.5 nm |
|
JHH |
NDB |
Griffin |
|
412.00 |
04W |
37.8 nm |
|
JZP |
NDB |
Pickens County |
|
285.00 |
04W |
39.7 nm |
|
GPQ |
NDB |
Carrollton |
|
278.00 |
02W |
39.8 nm |
|
BMW |
NDB |
Barrow County |
|
404.00 |
03W |
40.6 nm |
|
OUK |
NDB |
Calhoun |
|
323.00 |
02W |
45.1 nm |
|
DDA |
NDB |
Commerce |
|
244.00 |
03W |
45.9 nm |
|
OYD |
NDB |
Floyd |
|
388.00 |
02W |
49.0 nm |
|
DOB |
TACAN |
Dobbins |
077X |
|
01W |
9.2 nm |
|
PDK |
VOR/DME |
Peachtree |
113X |
116.60 |
02W |
6.3 nm |
|
ATL |
VORTAC |
Atlanta |
116X |
116.90 |
00W |
10.5 nm |
|
RMG |
VORTAC |
Rome |
101X |
115.40 |
01E |
42.6 nm |
|
ATL |
VOT |
Atlanta Muni |
|
111.00 |
|
8.7 nm |
Remarks
- E111:
ALL OPNS ARE CONDUCTED IN VFR WX CONDS. THE LNDG AREA IS LTD TO PVT
USE. THE PROPONENT COORDINATES USE OF HELI WITH GADO - ATLANTA GA....
E111 CON'D: A COMPATIBLE OPNL AGRMT IS MAINTAINED WITH THE OPERATOR
OF THE SKYPAD HELIPORT (WXIA).
Based
Aircraft
|
Aircraft
based on field: |
1 |
|
Helicopters: |
1 |
Wsb-tv Heliport
Address:
Fulton County, GA
Tel:
404-897-7000
Images
and information placed above are from
http://www.airport-data.com/airport/7GA1/
We
thank them for the data!
| General
Info |
| Country |
United
States |
| State |
GEORGIA
|
| FAA ID |
7GA1
|
| Latitude |
33-47-57.378N
|
| Longitude |
084-23-08.000W
|
| Elevation |
903 feet
|
| Near City |
ATLANTA
|
We don't guarantee the information is fresh and accurate. The data may
be wrong or outdated.
For more up-to-date information please refer to other sources.
|
 |